Description: construction of chemestry and Biology lab at GIC SITEL under Ramsa Name of Work lexz f k kk ds varxZr fo0 k M uUnkuxj ds jk0b0dk0 flrsy esa tho oa jlk u fo Kku iz kssx kkyk Hkou dk fuekZ k dk ZA
Details: Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in cutting (not exceeding 1.5 m in width or 10 sqm on plan) disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. in all types of soil Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 2
Sector: Rural Misc