Details: note :- rates should be filled with gst. laying pipes filling in foundation trenches as per drawing and technical specification clause 305.3.9sand filling providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-iii) : 6 graded stone aggregate 20 mm nominal size) earthworks excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications clause 305.1 of mord specifiction filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and
Sector: PWD