Description: Area Development of Artola Junction Entry Gate and Feature wall at Jageshwar Dham in District Almora Name of work Area Development of Artola Junction Entry Gate Feature wall at Jageshwar Dham in District Almora
Details: Note-The Contractor shall quote his/ their rates without GST. GSTwill be paid extra by the Department as per prevailing rate at the time of payment. Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Hard rock (blasting prohibited) Extra for every additional lift of 1.5 m or part thereof in excavation/ banking excavated or stacked materials. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not ex
Sector: PWD