Details: carriage of materials by mechanical transport including loading, unloading and stacking: lime, moorum, building , earth, manure or sludge and excavated rocks:: lime, moorum, building :1 km unit: carriage of materials by mechanical transport including loading, unloading and stacking: lime, moorum, building , earth, manure or sludge and excavated rocks:: earth:1 km unit: excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not: all kinds of soil:pipes, cables etc. exceeding 80mm dia. but not exceeding 300 mm dia. unit:metre filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and:watering, lead up to 50 m and lift upto 1.5 m unit: centring and shuttering includin
Sector: Power Sector