Details: open vehicle parking clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-iii): 6 graded stone aggregate 40 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form work for : retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. brick work
Sector: Generation