Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of engineer-in-charge. in cement mortar demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metre lead. for thickness of tiles above 25 mm and up to 40 mm dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. dismantling w.c. pan of all sizes including disposal of dismantled materials in
Sector: PWD