Details: demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineer in-charge. (15.1) demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar (15.7.4) providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: (a) applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to is. 2645 and approved by engineer-in-charge over the rcc slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed wi
Sector: Science University