Details: demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineer in-charge. (15.1) demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar (15.7.4) providing and laying app (atactic polypropylene polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°c, 0.87-0.89 kg/ litre and viscocity 70-160 cps. over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc, and preparing the surface complete. the vital physical and chemical parameters of the membrane shall be as under : joint strength in longitudinal and transverse dir
Sector: Science University