Details: ftyk ;kstuk ¼iwym gkml½ o"kz 2024&25 ds vurxzr eq[;ky; iksmh esa u;w iwym vkokl ds lehi vkbzi&aa ds ¼4 vkoklksa½ dk /olrhdj.k dj uo fuekz.k dk dk;za earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finis
Sector: PWD