Details: concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and t&p etc. required for proper completion of the work. as per drawings and technical specifications clause 802, 803, 1202 & 1203. providing and laying of interlocking concrete block (m-35) pavements having thickness 80 mm as per drawings and technical specification clause 1504. edging with 2nd class bricks, laid dry lengthwise (edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres) bituminous macadam providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve th
Sector: PWD