Details: supply, installation & commissioning of ropeway structure including the civil foundation, elctro-mechanical works with all respect as per scope of the specifications & directions of engineer-in-charge. (as per schedule no. 1 to schedule 4) schedule no. 7 – civil works (development of ancillaries during the epc period for the project site) earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge. all kinds of soil earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge. ordinary rock filling available excavated earth (excluding rock) i
Sector: Tourism