Details: making superelevation with lowering in half width & filling in remaining half width with coolie walling including supply of all material, labour, t&p etc. required for proper completion of work. lowering km 1 lowering km 2 lowering km 3 coolie walling km 1 coolie walling km 2 coolie walling km 3 wbm grading 1 by manual means/by mechanical means- providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per technical specification clause 405. km 1 km 2 km 3 patri filling with local soil with coolie walling after laying of soling coat including supply of all material, labour and t&p etc. required for proper completion of the work. e&b filli
Sector: PWD