Details: maintenance of earthen shoulder (filling with fresh selected soil) making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at omc upto a lead of 1000 m as per technical specification clause 1903 tack coat using vg-10 grade bitumen over hungry bituminous surfaces @0.40 kg/sqm, (including cost of bitumen) bituminous macadamproviding and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504. (bitumen vg-30 @ 3.3% of the weight of mix has been used for analysis purpose. the choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with clause 504 of
Sector: PWD