Details: hill side cutting work ( defect cutting) earth work in hill side cutting in all type of rock and soil for making 5.95m wide road in straight reaches and extra widening on curve as per plan l-section including of all m/l t&p etc.required for proper completion of the work. super elevation wok excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications clause 305.1 of mord specifiction construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 construction of coolie walling including supply of all material, labour, t&p etc. required for proper completion of the work as per direction of engineer-in- charge. (as per pwd utt