Details: construction of park boundary wall at residential area of 400 kv s/s kashipur earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate
Sector: Transmission