Details: clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. including supply of all material, labour and t&p etc. required for proper complition of the work. (cpwd dsr 2023 2.31) excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications clause 305.1 of mord specifiction (pwd sor miscellaneous 2024-25 1-2) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.ordinary soil, manual means, upto 3 m depth. including suppl
Sector: Generation