Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing providing concrete for plain/ reinforced concrete in open foundations complete asper drawings and technical specifications clause 802, 803, 1202 & 1203p.c.c grade m 10nominal mix 1:3:6 providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203. p.c.c. grade m 20 nominal mix (1:2:4) plastering with cement mortar (1:4), 15 mm thick in substructure as per technical specification clauses 613.4 & 1204 plain/reinforced cement concrete in substructure complete as per drawings andtechnical specification clauses 802, 804, 805, 806, 807, 1202 ans 1204r.c.c. grade m 25 supplying, fitting and placing hysd bar reinforcement (fe 415) in substructruecomplete as
Sector: Irrigation