Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge.all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level. 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size) providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size) providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption’s less than 0.08% and conforming to is : 15622 of ap
Sector: PWD