Details: excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per clause 1603.2. dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per hr.) including wages of operator and fuel including supply of all material, labour and t&p etc.required for proper completion of the work providing concrete for plain/reinforced in open foundation complete as per drawing and technical specification clause 802,803,1202 &1203 p.c.c 1:3:6 nominal mix stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704,1202 and 1204 random rubble masonry in 1:5 cement mortar random rubble stone masonry laid dry, in walls, retaining walls, etc including supply of all material, labour, t&p and royaltiies etc. complete as per drawing and technical specifications clauses 7
Sector: Irrigation