Details: earth work in rough excavation, banking excavated earth in layers cm in depth, breaking clods watering, rolling each layer with ½ ton or steel rammers, and rolling every 3rd and top-most layer with po 8 tonnes and dressing up in embankments for roads, flood banks, guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m. all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -all work upto plinth level. 1:5:10 (1 cement: 5 coarse sand: 10graded stone aggregate 40 mm nominal size) providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work upto plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) providing and laying in position cement concrete of specified grade cost of centring and shuttering - -all work upto plinth level 1:2:4 (1
Sector: Rural Misc