Details: 11-1 excavation for structuresearthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.11-1-1 ordinary soil concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and t&p etc. required for proper completion of the work. as per drawings and technical specifications clause 802, 803, 1202 & 1203 interlocking concrete block pavement6-7-1 providing and laying of interlocking concrete block (m-35) pavements havingthickness 80 mm as per drawings and technical specification clause 1504. plain/reinforced cement concrete in substructure complete as per drawings and technicalspecification clauses 802, 804, 805, 806, 807, 1202 ans 1204(
Sector: Urban Authority