Details: civil works: fencing work excavation of foundation for drainage site development for fencing wire crate in diversion p.c.c.in foundation (1:3:6) c.c. for drainage p.c.c. (1:2:4) in drainage- bottom side left and right side ms gate (0.5m*1.0m) with handling in diversion fencing with welded steel wire mess (75 mm*25mm) providing 1.2 m high fencing with angle iron posts 50 mm*6mm at 3 m centre to centre with 0.4m embedded in 1:2:4 grade cement concrete, corner and every 10th post to be stratted provided with welded steel wiremess and fixed to iron posts and bolts etc complete in all respects. ms gate (1.5m*2.0m) with welded angle iron post fixed in cement transportation to head load civil works: vcb room earth work/excavation of foundation p.c.c.(1:3:6)in fooundation rrm wall in fondation with 1:5 c.m. cement concrete block masonary with 1:5 c.m. plaster work in wall with 1:4 c.m. p.c.c.(1:2:4) in floor distempring and white washing in wall 2 coat. supply and fabrication wor
Sector: Renewable Energy