Description: Under the annual maintenance item in the year 2024 25 renovation work by PC with the use of shredded waste plastic material on Masit Sakainiya road along the tail of fatehganj canal on National Highway 74 in Gadarpur constituency of Distt Udhamsing Name of Work Under the annual maintenance item in the year 2024 25 renovation work by PC with the use of shredded waste plastic material on Masit Sakainiya road along the tail of fatehganj canal on National Highway 74 in Gadarpur constituency of Distt Udhamsingh nagar
Details: WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Prime Coat Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Tack coat using VG-10 grade bitumen Over Over dry and hungry bituminous surfaces @0.40 kg/sqm 20mm Open graded PC (using shredded waste plastic material )Providing, laying and rolling of open-graded premix carpet of 20 mm thicknesscomposed of 13.2 mm to
Sector: PWD