Details: clearing jungle including uprooting of rank vegetation ,grass,brush wood, trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the peripery of the area cleared. earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. bajri/silt clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the engineer-in-charge. providing concrete for plain/reinforced concrete in open foundations as per drgs and technical specification. nominal mix 1:3:6 (hand mixed) random rubble stone masonry laid dry, in walls, retaining walls, etc. including supply of all material, labour, t&p and royaltii
Sector: Irrigation