Details: hill side cutting excavation in hilly side cutting along with marked alignment between the job pillars of making the road 5.95 m wide on straight reaches with extra widening of curves as specified as shown on plan & section in all shorts of soil, rocks & shales and including the disposal of cutting material from the lead with all leads & lifts with roots & final dressingof road with clearance of slip during construction period including supply of all materials, labours t&p etc. required for completion of the work . unloading of earth, sand, lime, moorum, aggregate, stone boulder, brick aggregate, kankar, building , manure, crushed , flyash, stone for masonry work by mechanical means. (placing tipper at unloading point excluding time for haulage and return trip) haulage of materials by tipper excluding cost of loading, unloading and stacking (taking output 10t load and lead 10 km = 100 t.km surfaced road providing and laying of mechanically woven double twisted hexagonal shaped gabion
Sector: PWD