Details: (bridge) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. mechanical meansup to 3.0 m. plain cement concrete in open foundation complete as per drawing and technical specifications. pcc grade m15 reinforced cement concrete in open foundation complete as per drawing and technical specifications. rcc grade m 30 using batching plant, transit mixer and concrete pump supplying, fitting and placing hysd bar reinforcement in foundation complete as per drawing and technical specifications reinforced cement concrete in sub-structure complete as per drawing and technical specifications. rcc grade m 30 using batching plant, transit mixer and concrete pump up to 5.0 m. supplying, fitting and placing hysd bar reinforcement in sub-structure complete as per drawing and
Sector: PWD