Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. (as per cpwd dsr 2023, code no.- 2.8.1) clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. (as per cpwd dsr 2023, code no.- 2.31) providing & anchoring 25 mm dia tor steel anchors/ dowels bars including supply of all material ,labour,t&p etc required for proper completion of work. this includes making of 45 mm dia drill hole for anchoring depth of 4.00/5.00/6.00 m holes should be filled with cement mortar along with bars and p
Sector: Generation