Details: supplying all materials, labour, t&p for power supply of 5 kw load including 3% stock, storage & insurance,12.50% contigency, t&p & transportation, 20% charges of poles, 5% charges for dtr and 10% charges of other items, including commissioning & testing etc all complete, as per the estimate supplied by tpnodl department and direction of engineer-in-charge. line part 400 kg, 10 mtr. long psc pole 11 kv 'v' cross arm ( 10.2 kg) gi gi back clamp for 'v' cross arm (11kv)(0.85kg/ each) 11 kv f clamp 2.9 kg each gi 11 kv pin insulator polymer 11 kv (t&c) hardware 45 kn (gi) disc insulator (t & c) 45 kn polymer earthing of support (coil type) ht stay set complete g.i. 7/10 g.i.stay wire ht stay clamp (1.9 kg/pair)(gi) ht stay insulator type-c 100 x 50 x 6mm ms channel(9.20kg/mtr) ms nuts & bolt of assorted size 11 kv 55 mm2 oh insulated cable gi base plate (500 x 500 x 10 mm ) for psc pole 20 kg sundries for survey, pvc tape, ampere tape, danger board, small size nut and bolt pr
Sector: Water supply and Sewerage