Details: clearing and grubbing of road land including uprooting rank vegetation grass, bush, shrubs and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness with all labour, t&p, taxes & cess etc complete as per direction of engineer-in-charge. earth work in excavation in hard soil in approved borrow area loading into and transportation of the excavated earth by mechanical mean and depositing them on properly prepared and approved surhace in filling reaches of embankment to required section including spreading and leveling the earth work ready for watering and compaction to 95% proctor density under omc condition with sheep foot rollers with all labour t&p and transportation by transport vehicles, the earth with in 5km lead and complete in all respect as directed by
Sector: Infrastructure