Details: civil work excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the engineer in-charge within an initial lead of 1.5km from the place of excavation complete to a depth of 3 mtr as per direction of eic excavation of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the excavated materials at places away from the work site with all leads and lifts, t&p etc. comp. as directed by eic. filling in foundation and plinth with good river sand including laying, watering and ramming in 23 cm. (9”) thick layers with all leads and lifts comp. incl
Sector: Mining