Details: clearing & grubbing road land including uprooting rank vegitation, grass, bushes & tree grith upto 300mm, removal of stumps of tree disposal of unservicable materials upto lead of 1 km including removal & disposal of top organic soil not exceeding 150mm in thickness etc. complete in all respect as per direction of the engineer-in-charge. loosening, leveling and compacting original ground supporting embankment to facilitate the placement of 1st layer of embankment , scarifying the depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density etc. complete in all respect as per direction of the engineer-in-charge. construction of granular sub base by providing close graded matetrials (grading iii) spreading in uniform layer with motor graded on prepared surface mixing by mix in place mathod with rovotor at omc and compacting with roller to achieve to desired density etc. complete in all respect as per direction of the engineer-in-cha
Sector: Infrastructure