Details: clearing grass and removal of up to a distance of 50mtr out side the periphery of the areas including all labour t & p etc. complete as per the engineer-in-charge. per one hectare dismantling and removiing cement concrete inculding stacking the usefull materials for reuse and removing the debris within 50m lead etc. complete as per direction of engineer - in - charge . excavation of all type of soil in canal by mechanical means and unloading the soil with a lead of 1.00km including hire and running charges of all the machinaries complete in dams, for all heights etc. collecting, supplying, stacking and laying good quality moorum & sand admixure of same 70% moorum & 30% sand in volume) in sub-base in layer not exceeding 22.50 in depth ( 15cm compacted thickness) watering and compacting to required density in omc condition with vibratory roller thickness including cost of all materials and labour charges conveyance, royalty spreading the same etc. complete as per direction of en
Sector: Infrastructure