Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. excavation in all kinds of soil by manually including moorum, stoney earth, gravel etc. except all kinds of rock & boulders exceeding 0.014cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas, benching in existing canal bank including rough dressing with all leads and lifts including use of the excavated useful materials in canal banking with compaction under omc condition including construction, maintenance, watering and lighting of haul road etc. complete and as per the specification and direction of the engineer-in-charge. excavation, loading, unloading a
Sector: Infrastructure