Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area etc complete and as per the direction of the engineer - in - charge. excavation of all type of soil in canal bed & by mechanical means loading into & transportation by mechanical means & unloading the soil within a lead of 1 km in dumping yard including hire and running charges of all machinaries etc. complete as per the direction of engineer-in-charge. excavation of all type of soil in canal bed & by mechanical means loading into & transportation by mechanical means & unloading the soil within a lead of 5 km on properly preapared & scientifically approved surface including spreading & levelling the earth in 22.5cm layers and watering earthwork upto omc condition and compaction by vibratory rollers and dozers in layers not exceeding 22.5 cm to 95% dry density including hire and running charges of all machinaries in dams and for all heights etc. complete as per the direction of engine
Sector: Infrastructure