Details: clearing shrub jungles uprooting stumps and small bushes and trees below 1 m girth on pre- measurement, deposing the debries away from the work site with all leads,lifts and delifts with cost of all labour t & p, hire and running charges of all machineries, labour welfarecess etc.complete as per the direction of the engineer-in-charge. earth work in suitable type of soil in borrow area,loading into transport vehicle manually or mechanically and transportation of earth by mechanical means unloading the same over the approved surface of embankment in proper profiles with 5km leads, including rough dressing and breaking clods of maximum 5cm. to 7cm. size including removal of roots, bushes, other deleterious materials from transported earth with all cost , carriage, royalty,labour,welfarecess & laying in layers not exceeding 22.5 cm in depth including compasition by sheep foot roller condition with hire and running charges of all machineries with all labour & t & p required for the work e
Sector: Infrastructure