Details: scarifying the existing bituminous road surface to depth of 50mm and disposal of scarified materials with all leads, lifts and delifts etc. complete as per direction of engineer-in-charge. clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of servicible materials to be used for auctioned, up to a lead of 1000 mtr. including revoval & disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of engineer-in-charge. (premeasurement to be recorded prior to execution) earth work in excavation of foundation in all kinds of soil by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the foundation bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in
Sector: Irrigation