Details: scarifying the existing bituminous road surface to depth of 50mm and disposal of scarified materials with all leads, lifts and delifts etc. complete as per direction of engineer-in-charge. clearing grass & removal of debrises and up to a distance of 50mtr. out side the periphery of the area and depositing the debrises away from the working area including all t&p etc. complete asper direction of engineer-in-charge. (premeasurement will be taken prior to execution) earth work in excavation by cutting river bank / embankment for benching by mechanical means & lying over properly prepared surface in all kinds of soil with all leads, lifts & delifts including leveling and dressing the bank n bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth with compaction under omc condition by compacting equipment including hiring & running charge of eq
Sector: Irrigation