Details: clearing grass and removal of up ta a distance of 50 metres out side the periphery of the area etc complete as per the direction of engineer in charge earth work in oridinary soil within a lead of 50 m and initial lift of 1.50 m including rough dressing and levelling the bed and disposal of excavated materials nearby canal bank (breach portion)etc complete as directed by the e.i.c. earth work in excavation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm size and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring & shuttering etc. if required, all labour charges, hire & running charges of all machineries, t & p required for the work, b & o.c. workers welfare cess & taxes etc. complete and as directed by the engineer-in-charge. filling the foundation & plinth with sand and well watered including cost, conveya
Sector: Irrigation