Details: earth work in excavation of foundation in all kinds of soil not exceeding 0.014 in volume within 50 mtr initial lead and 1.50 mtr initial lift including rough dressing and levelling the bed & depositing the excavated earth away from work site with cost of all labours and t&p etc. complete as per the direction of engineer-in-charge. excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanicalm means and loading the soil within initial lead of 1 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and for all heights including construction, maintenance, watering and lighting of haul roa and borrow area etc. complete as per direction of engineer-in-charge. filling foundation and plinth with filing sand including supplying sand and
Sector: Irrigation