Details: dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. lead etc completed and as per direction of the engineer - in charge. earth work excavation of foundation in hard soil including dressing & leveling the bed and sides and depositing the excavated materials away from work site with all leads, lifts, sundries and t&p required for the work etc. complete as directed by the engineer-in-charge. filling foundation and plinth with sand including cost, conveyance and royalty of all materials to the work site including watering and ramming with all leads, lifts, sundries and t&p etc. complete as per direction of the engineer-in-charge. rc.c cement concrete m-20 grade with crushed granite course aggregade of size 12mm down graded including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all
Sector: Irrigation