Details: clearing and grubbing road land including uprooting rank vegetation,grass bushes,sapling and tree girth upto 300 mm, and removal of upto a distance of 50 metres outside the periphery of the area etc. complete and as per direction of the engineer-in-charge. spreading watering and ramming sand for filling of approved quality on finished approved surface portion including cost, carriage,lifts, delifts construction and removal of coffer dam & dewatering if required with all other incidental charge etc. complete as per direction of the engineer-in-charge. rigid smooth centering & shuttering for c.c. work including false work and dismantaling them after casting including cost & convayance of materials complete as per drawing & specification with all leads, lifts, sundries and t&p etc. complete as per the direction of engineer-in-charge. c. c work of m-20 with 20mm down graded hard granite crusher broken chips including c
Sector: Irrigation