Details: construction of gci cover shed and concrete drying platform- -threshing floor at hatikhoj, tundla, sirol and turlakhaman ppc's of kesinga block under rmc, kesingaearth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of water pumps sundries & t & p required for the work complete as directed by the engineer in charge. supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalities and taxes of all materials cost of all labour sundries t&p required for the work etc complete in all respect as directed by the engineer in charge. (measurement will be taken on finished compa
Sector: Agri Marketing