Details: earth work in excavation in ordinary soil including trimming the slopes and bed to the required section and depositing the excavated soil in canal banks or nearby filling reaches or spoil banks including breaking clods to maximum 5cm to 7cm size and laying in layers not exceeding 0.3m in depth with all leads, lifts & delifts, all labour charges, t&p, b & o.c. workers welfare cess excluding gst, etc. complete as per the approved drawing, design, specification and direction of the engineer-in-charge. (measurement shall be taken on finished level section) clearing shurb jungles and uprooting stumps and small bushes and trees below 1 m girth on premeasurement and disposing off debris away from the work site, all labour charges, with all lead, lifts & delifts t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge
Sector: Irrigation