Description: Construction of Academic cum Workshop Building GF plus FF plus SF plus HR including the Compound Wall Approach Roads in respect of New Government ITI in Kuchinda Sub division of Sambalpur District Name of Work Construction of Academic cum Workshop Building GF FF SF HR including the Compound Wall Approach Roads in respect of New Government ITI in Kuchinda Sub division of Sambalpur District
Details: CIVIL WORKEarth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. Ground Floor Boundary wall Internal Drain with coverslab Approach Road Main Gate Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as directed by the Engineer in charge. Approach Road Construction of granular sub-base by providing Gr.-VI material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibrato
Sector: PWD