Details: earth work in hard soil within 50 mtr initial lead and 1.5 mtr lift incluiding breaking of clouds to minimum 5 cm to7 cm and laying in layers not exeeding 0.30 mtr in depth earth work excavation in foundation & plinth in hard soil including rough dressing and levelling the bed within 50 meter initial lead and 1.5 meter initial lift complete as per direction of the engineer-in-charge. filling f &p with sand well watered and rammed including cost of materials labour & t &p etc.as per direction of the engineer-in-charge. cement concrete (1:4:8) with 4 cm size hard granite metal including curing convynance and labour with t &p all complete as per the direction of engineer-in-charge. flyash brick masonary in cement mortar (1:6) in foundation & plinth including watering curing cost & conveynance t&p etc complete as per direction of the engineer-in-charge. 12mm thick cement plaster over brick work in cement mortar (1:6)including racking out joints watering cureing cost of conveynce e
Sector: Irrigation