Details: civil works (part-i) earthwork in excavation of foundation in hard soil or gravelly soil within 50m initial lead and 1.5m, initial lift including shoring,shuttering, propping bullahs, piling,dewatering from foundation, with & working pumps & staking the excaveted materials away from the working area including rough dressing the bed and foundation tranches to required size including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, t&p required for the work etc. complete as per specification & direction of engineer-in-charge supplying and filling in foundation and plinths with sand well watered and compacted including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, watering, sundries, tools and plants, etc., complete as per the direction of the engineer-in-charge. supplying, diluting and preparing chemical emulsion like imidacloprid 30.5 % sc or other chemicals approved by central insecticides board or as di
Sector: PWD