Details: clearing grass and removal of up to adistance of 50 metres outside the periphery of thearea including all labour charges,t&p etc. complete in all respects as per the direction of the engineer-in-charge. earth work in filling in hard soil with all leads & lifts including rough dressing and breaking clods to maximum 5cm to 7 cm and laying in layers not exceeding 0.30mt in depth etc. complete in all respects with all labour, t & p, royality etc. and as directed by the engineer-in-charge.(measurement shall be made on level section as per approved design). earth work in excavation of foundation in hard soil with all leads, lifts, delifts including dressing and leveling the bed to design section and depositing the excavated materials away from working area in spoil banks with all leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required, bailing out water with all cost, conveyance, labour and cess and
Sector: Irrigation