Details: excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. c.c.(1:4:8) with 4 c.m. size h.g. metal in f&p. brick work with fly ash bricks inc.m(1:6) in foundation and plinth filling in foundation and plinth with excavated materials including watering and ramming brick work with fly ash bricks inc.m(1:6) in super structure in ground floor brick work with fly ash bricks inc.m(1:6) in super structure 1st floor rcc work m-20 grade with 20 mm and down grade hg chips (cb) including hoisting,lowering & laying concrete and compacting by using ramming for ground floor(a) footing and column bases (b) plinth band (c) column and beam (d) sun shade, loft and chajja (e) lintel (f) roof slab (g) stair rcc work m-20 grade with 20 mm and down grade hg chips (cb) including hoisting,lowe
Sector: Irrigation