Details: supplying all materials, labour,t&p and making of m.s spiked grill made out of 16mm m.s square bar, m.s flat (50 x 6mm) including labour charges for making spike to the square bar, driling hole to the flat with necessary welding inclind cost of olding road, hire & running charges of olding transformer including cost of all materials, labour t&p as required for the work & direction of engineer-in-charge. supplying all materials, labour, t&p and providing cement concrete (1:2:4) with 12mm size c.b hard granite chips including cost, conveyance, royalty and taxes etc. all complete as per the direction of engineer-in-charge. supplying all materials, labour,t&p for painting two coats with enamel paint over a coat of primer to iron works with cost of materials, labour, t&p with etc. all complete as per direction of engineer-in-charge.
Sector: Urban Authority