Description: D Construction of Baisinga Branch Canal from RD 62265m to 62691m including all structures and service road Name of Work Construction of Baisinga Branch Canal from RD 62265m to 62691m including all structures and service road
Details: Clearing and grubbing of all kind of jungles (heavy & light) uprooting stumps (covered with plants less than 30 cm girth) and disposing of the debris clear of work site with supply of all equippments, tools & plants, labour etc. required for the work including supervision charges and including all taxes etc. complete as per direction of Engineer-in-charge. (Payment basing on pre-measurement) Triangular or square section trench cutting of 0.15 m. deep for alignment and demarkation purpose including measuring and marking lines with all labour, t & P complete as per direction of Engineer-in-charge. Excavation in base stripping the sheet of embankments by manual or mechanical means removing of all organic materials in all kinds of soil including stoney earth, moorum mixed with pebble concrete, all types of stone masonry etc. and levelling the bed laying the excavated materials away from the work site in layers not exceeding 225 mm in depth including breaking clods 5 cm to 7 cm size with al
Sector: Irrigation